You are about to finish your registration. Please check your mailbox (including spam folder). There should be a letter with a confirmation link. Check setting to make sure that your e-mail address is correct.
Send letter againDescription
The first Albanian railroad was built in 1946, marking the beginning of the country’s railway network. The Durrës–Peqin line, spanning 37 kilometers, was constructed as part of Albania’s post-war reconstruction efforts under Enver Hoxha’s regime. Built primarily through volunteer labor, the project aimed to modernize transportation and boost economic development. Officially inaugurated in 1947, this railway laid the foundation for future expansions, eventually connecting major cities like Tirana, Shkodër, and Vlorë. While Albania’s railway system flourished during the communist era, it has since declined due to lack of investment and increased reliance on road transport.
Obverse
![]() |
Depicts a modern train emerging from a railroad tunnel, with the Emblem of the People's Republic of Albania positioned above. The design is enclosed within a circular border, featuring the country's name in Albanian, while the year of the Albanian Railroad's establishment and the year of coin issue are inscribed below. REPUBLIKA POPULLORE SOCIALISTE E SHQIPERISE |
---|---|
Reverse
![]() |
Depicts a steam train entering a railroad tunnel, with black locomotive smoke billowing against the ceiling. The date of issue is inscribed below within a circular border, with the country's name in Italian above and the denomination positioned at the bottom. ALBANIA |
Edge |
5 Lekë
People's Socialist Republic
KM# 61
Characteristics
Type | Commemorative Issue (Non-circulating) |
Material | Cupronickel |
Weight | 28.2 g |
Diameter | 38.7 mm |
Thickness | 3.25 mm |
Shape |
![]() |
Alignment | Medal |
Mint |
Central Bank of Hungary (MNB)
|