You are about to finish your registration. Please check your mailbox (including spam folder). There should be a letter with a confirmation link. Check setting to make sure that your e-mail address is correct.
Send letter againDescription
In the summer of 2014, months after taking office as President of Egypt, Abdel Fattah el-Sisi ordered the expansion of the Ballah Bypass from 61 metres (200 ft) wide to 312 metres (1,024 ft) wide for 35 kilometres (22 mi). The project was called the New Suez Canal, as it allows ships to transit the canal in both directions simultaneously. The project cost more than E£59.4 billion (US$9bn) and was completed within one year. Sisi declared the expanded channel open for business in a ceremony on 6 August 2015.
Obverse
|
Depicts the logo of the Suez Canal Authority (two opposite ships), the inscription "New Suez Canal" above, year of issue in Gregorian and Hijri calendars (both in Arabic). قناة السويس |
---|---|
Reverse
|
State name in Arabic, denomination in Arabic and English. جمهورية مصر العربية |
Edge |
50 Qirsh
(Piastres)
National Achievements of Egypt
New Suez Canal
Subscribe series
KM# 1000
National Achievements of Egypt
New Suez Canal
Characteristics
Type | Commemorative Issue (Circulating) |
Material | Brass Clad Steel |
Weight | 6.5 g |
Diameter | 23 mm |
Thickness | 2.4 mm |
Shape | round |
Alignment | Medal |
Mint |
Cairo Mint
|